Jagran Josh Logo

List of Hydroelectric Power stations in Pakistan

06-MAY-2013 13:18

    Station

    Capacity (MW)

    Status

    Tarbela Dam

    3,478

    Operational, proposed extension project to increase electricity generation by 1410 MW

    Ghazi-Barotha Hydropower Project

    1,450

    Operational; Run-of-the-river

    Mangla Dam

    1,000

    Operational, plan to increase generation by 120 M

    Warsak Dam

    243

    Dam completely silted up; Power generation by Run of the river. Extension is being planned

    Chashma Barrage

    184

    Operational

    New Bong Escape

    84

    Operational. Privately owned hydropower plant

    Khan Khwar hydropower project

    72

    Operational 

    Jagran-I Dam

    30.4

    Operational

    Rasul Barrage

    22

    Operational

    Malakand Dam

    22

    Operational

    Dargai Dam

    20

    Operational

    Shadiwal Dam

    14

    Operational

    Chihoki Dam

    14

    Operational

    Nadipur Dam

    13

    Operational

    Kuram Garhi Dam

    4

    Operational

    Renala Dam

    1

    Operational

    Chitral Dam

    1

    Operational

    Gomal Zam Dam

    17

    Under construction; Hydropower station and dam is completed but irrigation system is 40% complete due to poor security in area. Expected to be completed by Dec 2012

    Allai hydropower project

    121

    Under construction; To be completed in Feb 2012 

    Duber Khwar hydropower project

    130

    Under construction; to be completed by 2012

    Jinnah hydropower project

    96

    The first unit has already been synchronized with the National Grid. All other units will be synchronized by December 2012.The under construction plant was damaged when it submerged during 2010 Pakistan floods which delayed its progress.

    Neelum–Jhelum Hydropower Plant

    969

    Under construction. To be completed by 2016, two years ahead of schedule since WAPDA has purchase 2 TBM,s which will become functional by July 2012. Wapda is also in process of purchasing diesel engines to run these TBM,s.

    Satpara Dam

    17.3

    Under construction; expected to be completed in 2012

    Golen Gol project

    106

    To be completed by the end of 2015.cost estimate $130 million 

    Patrind Dam

    150

    Privately owned hydropower plant. Under construction. expected to be completed in 2016;

    Darawat Dam

    0.45

    Under construction 

    Kohala Hydropower Project

    1100

    Tender given. Construction will be started once funds are available. Cost estimate $2.155 billion 

    Kalabagh Dam

    3600

    Ready to be constructed. Engineering study completed but project is currently at pause due to lack of consensus between provinces.

    Kurram Tangi Dam

    83.4

    Ready to be constructed. Engineering study completed.

    Diamer-Bhasha Dam

    4,500

    Ready to be constructed. Engineering study completed. Construction of a new bridge at Thakot, on River Indus and 323 km of Karakorum Highway (KKH) from Havalian to Dam site is required since currently no infrastructure exists for transportation of heavy machinery & equipment. To be completed in 8 years from commencement of project i.e. 2020.

    Bunji Hydropower Project

    7,100

    Run-of-the-riverFeasibility studies in progress.,cost estimate $6.8 billion

    Phandar Hydropower Project

    80

    Detailed engineering design or tender of documents under process, cost estimate $4.4 billion

    Basho

    28

    Detailed engineering design or tender of documents under process

    Proposed, cost estimate $40 million 

    Keyal Khwar

    122

    Detailed engineering design or tender of documents under process,cost estimate 180 million euro 

    Lawi

    70

    Detailed engineering design or tender of documents under process,cost estimate $120 million 

    Harpo

    33

    Detailed engineering design or tender of documents under process, cost estimate $46 million

    Munda Dam

    740

    Under engineering study,cost estimate $1.149 billion

    Akhori Dam

    600

    Feasibility study stage, cost estimate $4.4 Billion 

    Bara Dam

    5.8

    under construction or under engineering study

    Dasu Hydropower Project

    4,320

    Feasibility studies ongoingcost estimate $5.3 billion

    Lower Spat Gah

    496

    Feasibility studies ongoing,cost estimate $697 million

    Lower Palas Valley

    665

    Feasibility studies ongoing,cost estimate $763 million

    Thakot

    2,800

    Feasibility studies ongoing, cost estimate $6 billion 

    Patan

    2,800

    Feasibility studies ongoing,cost estimate $6 billion 

    Tank Zam Dam

    25.5

    Proposed, cost estimate $234 million

    Mahl Hydropower Project

    600

    Proposed, Run-of-the-river 

    Kotli Hydropower Project

    100

    Proposed, Run-of-the-river 

    Taunsa

    120

    Proposed

    Guddu

    33

    Proposed

    Karot, Pakistan

    720

    Proposed

    Azad Pattan

    650

    Proposed

    Harighel

    53

    Proposed

    Sehra

    130

    Proposed

    Chakotti Hattian

    500

    Proposed

    Jagran-II

    48

    Proposed; Run-of-the-river;France has promised to fund part the construction. Construction expected to start in 2015.

    Jabban

    22

    Proposed

    Sharmai

    115

    Proposed

    Madian, Pakistan

    157

    Proposed

    Asrit Kedam

    215

    Proposed

    Kalam Asrit

    197

    Proposed

    Gabral Kalam

    101

    Proposed

    Karang

    458

    Proposed

    Kaigha

    548

    Proposed

    Shogo-Sin

    132

    Proposed

    Shushgai Zhendoll

    144

    Proposed

    Yogo, Pakistan

    500

    Proposed

    Naltar-3

    16

    Proposed

    Naltar-5

    18

    Proposed

    Thor Hydropower Project

    3.6

    Proposed 

    Yulbo Hydropower Project

    3000

    Proposed 

    Shyok Hydropower Project

    520

    Proposed 

    Tungus Hydropower Project

    2200

    Proposed 

    Skurdo Dam

    1600

    Proposed 

    Dudhnial Hydropower Project

    960

    Proposed 

    Suki Kinari Hydropower Project

    840

    Proposed 

    Kundal Shahi Hydropower Project

    960

    Proposed 

    Trappi Hydropower Project

    32

    Proposed 

    Rajdhani Hydropower Project

    132

    Proposed

    Tangir Hydropower Project

    15

    Proposed, cost estimate $30.967 million 

    Matiltan Hydropower Project

    84

    Proposed 

    Gulpur Hydropower Project

    100

    Proposed 

    Winder Dam

    0.3

    Proposed, cost estimate $148 mill 

    Naulong Dam

    4.4

    Proposed, cost estimate $377 million

    Hingol Dam

    3.5

    Proposed, cost estimate $311 million 

    Garuk Dam

    0.3

    Proposed, cost estimate $21 million 

    Pelar Dam

    0.3

    Proposed, cost estimate $20 million

    Nal Gaj Dam

    0.3

    Proposed, cost estimate $332 million 

    Daraban Zam Dam

    0.75

    Proposed, cost estimate $69 million

    Tank Zam Dam

    25.5

    Proposed, cost estimate $234 million 

    Bara Dam

    5.8

    Proposed, cost estimate $167 million 

    Ghabir Dam

    0.15

    Proposed, cost estimate $121 million 

    Papin Dam

    0.2

    Proposed, cost estimate $101 million 

     

     

     

    Latest Videos

    Register to get FREE updates

      All Fields Mandatory
    • (Ex:9123456789)
    • Please Select Your Interest
    • Please specify

    • By clicking on Submit button, you agree to our terms of use
      ajax-loader
    • A verifcation code has been sent to
      your mobile number

      Please enter the verification code below

    Newsletter Signup
    Follow us on
    This website uses cookie or similar technologies, to enhance your browsing experience and provide personalised recommendations. By continuing to use our website, you agree to our Privacy Policy and Cookie Policy. OK