1. Home
  2. |  
  3. Engineering Exams |  

JEE (Main) Mathematics Practice Paper: Set-I

Oct 20, 2015 18:13 IST

    Find JEE (Main) Mathematics Practice Paper for the year 2016 JEE exam. These questions not only help the students to prepare for exams in a better manner but also help them in understanding the depth with which a topic should be studied. At the and of the paper, student can find the answer for each question.

    Few sample questions from the Question Paper are given below:

    Q. If the roots of the equation a(b – c)x2 + b(c – a) x + c (a – b) =0 are equal,  then  a, b and c are in:

    (a) AP

    (b) GP

    (c) HP

    (d) All of these

    Q. (1 + i) x + (1 + i3) x + (1 + i5) y + (1 + i7) y will be real number, if and only if:

    (a) x = y + 1                                                                       

    (b) x = y – 1

    (c) x = y                                                                  

    (d) x > 0, y > 0

    Q. If a1, a2, a3 as well as b1, b2, b3 are in G.P. with the same common ratio, then the points (a1, b1), (a2, b2) and (a3, b3):

    (a) are vertices of a triangle           

    (b) lie on parabola

    (c) lie on a circle                                                    

    (d) lie on a straight line

    Q. Number of matrices of 2 × 2 matrices A, which are satisfying the relation A + AT = I and AAT = I:

    (a) 1

    (b) 2

    (c) 3

    (d) 4

    Q. Let x1 and x2 be mth roots of unity which subtend a right angle at the origin. Then ‘m’ must be of the form:

    (a) 4k + 1

    (b) 4k + 2

    (c) 4k + 3

    (d) 4k

    Q. Find the equation of the plane through the line of intersection of the planes x + y + z = 1 and 2x +3y + 4z = 5 which is perpendicular to the plane x y + z = 0

    (a) x - z - 2 = 0

    (b) x - y + 2 = 0

    (c) x - z + 2 = 0

    (d) y - z + 2 = 0

    Q. A manufacturer produces nuts and bolts. It takes 1 hour of work on machine A and 3 hours on machine B to produce a package of nuts. It takes 3 hours on machine A and 1 hour on machine B to produce a package of bolts. He earns a profit, of Rs 17.50 per package on nuts and Rs. 7.00 per package on bolts. How many packages of each should be produced each day so as to maximize his profit, if he operates his machines for at the most 12 hours a day?

    (a) 3 packages of nuts and 6 packages of bolts

    (b) 3 packages of nuts and 3 packages of bolts

    (c) 6 packages of nuts and 3 packages of bolts

    (d)3 packages of nuts and 8 packages of bolts

    Q. The length x of a rectangle is decreasing at the rate of 5 cm/minute and the width y is increasing at the rate of 4 cm/minute. When x = 8 cm and y = 6 cm, which of the following is true?

    (a) Perimeter is decreasing at the rate of 2 cm/min

    (b) Area of the rectangle is increasing at the rate of 2 cm2/min

    (c) Both A & B

    (d) None of these

    To get the complete Practice Paper, Click Here

    Latest Videos

    Register to get FREE updates

      All Fields Mandatory
    • (Ex:9123456789)
    • Please Select Your Interest
    • Please specify

    • ajax-loader
    • A verifcation code has been sent to
      your mobile number

      Please enter the verification code below

    This website uses cookie or similar technologies, to enhance your browsing experience and provide personalised recommendations. By continuing to use our website, you agree to our Privacy Policy and Cookie Policy. OK
    X

    Register to view Complete PDF